Skip to main content

Services · Massachusetts statewide

Residential Tile Installation

Porcelain, ceramic, marble, glass — installed by a crew that does only tile. Schluter waterproofing standard for wet areas.

Get your free estimate

~30 sec

We respond within 1 business day.

By submitting, you agree to be contacted about your project. We do not sell or share your information.

What you get

From bathroom floors to whole-home porcelain to entryway marble — we install residential tile in every room of the house. Crews are tile-only, so the prep, layout, and waterproofing get the attention they need. You get a clean install, a fixed timeline, and a written warranty on the labor.

  • Material agnostic

    Porcelain, ceramic, natural stone, marble, glass, cement, mosaic. We have set them all.

  • Schluter waterproofing

    Full Kerdi system on wet areas — membrane, banded corners, sealed penetrations. Nothing improvised behind the tile.

  • Layout planned in advance

    We dry-lay before we set. Cuts land in the right place. Patterns line up across the room.

  • Substrate done right

    Floor leveling, cement board, anti-fracture membrane where needed. Tile lasts as long as what is under it.

Our process

How the job runs.

  1. 01

    On-site measure & estimate

    We come measure, look at substrate and moisture, and leave you with a fixed-price written quote.

  2. 02

    Tile selection support

    We send you to the right shops for the look you want — and tell you which tiles install well versus the ones that fight you.

  3. 03

    Demo & prep

    Tear-out, dust containment, floor leveling, waterproofing membrane installed and tested.

  4. 04

    Set & grout

    Dry-layout, full coverage thinset, level setting, sealed grout. Photos before grout for waterproofing record.

  5. 05

    Final clean & walkthrough

    Site cleaned. Punch list walked with you. Care instructions handed off.

Recent tile installation work

See gallery
  • Tile Installation project
  • Tile Installation project
  • Tile Installation project

Waterproofed right

Schluter Kerdi standard on all wet work.

On the day we said

Fixed start and end. Updates if anything moves.

Tile-only specialists

Same crew, same standard, every job.

Questions

About tile installation.

A typical bathroom floor + tub surround is 5 to 8 working days. A full bathroom remodel with custom shower is 8 to 14 days. Whole-home tile floors run 1 to 3 weeks depending on square footage and prep needs.

Ready to scope your tile installation project?

Free in-home estimate, fixed-price written quote, response within 1 business day.

Call (857) 326-1213